Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
All
4-8-2015
< Previous Log Entry
Next Log Entry >
Date:
4-8-2015
Number of Hours:
2.50
Manual Reference:
8-18
Brief Description:
Empennage fairing
Today I worked on fitting the empennage fairing to the vertical and horizontal stabilizers and the fuelsage.
I drilled the fairing to the horizontal stabilizer but then found that I had not yet attached the platenuts to the vertical stabilizer.
Fairing was removed and platenuts were drilled to the VS, holes deburred and dimpled and the platenuts riveted.
Fitting fairing
Drilling for platenuts
Platenuts riveted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.