KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  3-17-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Reinstall cabin parts

With the cabin painted I began reinstalling various interior items that had be previously rmoved.

The rudder pedals were installed and all bolts torqued to spec. The rudder pedal brace was riveted to the firewall reinforcement angle. The rudder center bearing block was bolted to the brace and bolts torqued to spec. Left seat back was temporarily attached so I could sit in it and verify that rudder positioning was correct.

The flap actuator arm was installed and bolts torqued to spec. The flap actuator brace was installed with screws. The flap actuator was reinstalled and bolts safetied.

The air vent ducts were clecoed to the fuselage die skins and bonded with JB Weld. Rivets will be applied tomorrow.

The canopy side railes were positioned and one side drilled to proper hole size to screws. Five screws were installed. It is really hard to get a wrench on the nut because of the shape of the channel.
' style=

Rudder pedals installed

Rudder pedals installed

' style=

Flap actuator and arm installed

Flap actuator and arm installed

' style=

Canopy side rail final drilled and attached

Canopy side rail final drilled and attached

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.