KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  3-3-2015
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Scuff cabin interior

Today I spent the day scuffing the interior cabin areas in preparation for painting. I also disassembled the tailwheel and tool parts to a local powder coat shop for powder coating

Tomorrow is supposed to warm up some so hopefully I can open the hangar door and give all the scuffed parts and areas a good wipe-down with MEK. Then I will need to mask things off to be ready for the paint shop.

Also, Skip comes over tomorrow to help remove the wings.
' style=

Scuffed interior

Scuffed interior

' style=

Forward cabin

Forward cabin

' style=

Tailwheel parts to be powder coated

Tailwheel parts to be powder coated

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.