KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  11-25-2014
Number of Hours:  6.00
Manual Reference:  8-12
Brief Description:  Floors

Today I completed riveting the baggage compartment floors. Then I clecoed the aft seat floors in place and went to work on the crotch strap brackets. These were assembled and drilled to the appropriate seat ribs, were removed, deburred and dimpled for nutplates, nutplates riveted, then were riveted to the seat ribs. These were not particularly hard to install but it did take a god bit of time.

To prepare for the aft seat floor installation cut cut to length the 6 pieces of piano hinge that are used as the seat back adjustment.
' style=

Crotch strap bracket clamped for drilling

Crotch strap bracket clamped for drilling

' style=

Brackets prepared

Brackets prepared

' style=

Brackets riveted and aft seat floor clecoed

Brackets riveted and aft seat floor clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.