KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  9-3-2014
Number of Hours:  5.00
Manual Reference:  8-6
Brief Description:  Center fuselage

I completed deburring, dimpling, seaming and fluting ribs and bulkheads for the center fuselage. The seat ribs were clecoed to the center and baggage area bulkheads for riveting, then I decided I wanted to prime the flanges of the ribs before riveting. The ribs are stainless and I was concerned about bi-metallic corrosion. So I took everything apart, primed the flanges, waited for drying and then put it all back together. I riveted a could of the ribs but decided I need to reposition somehow to get a better rivet stance, and see if I can place the manufactured hear of the rivet on the rib flange side. I don't like the distortion the rib has when the manufactured head is on the bulkhead side. I decided to wait on the riveting and inserted the upper and lower bolts and washers and nuts for the seat rib to center bulkhead connection.
' style=

Reassembled for riveting

Reassembled for riveting

' style=

First two ribs riveted

First two ribs riveted

' style=

Back side of riveted ribs. Slight distortion on rib flanges.

Back side of riveted ribs. Slight distortion on rib flanges.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.