KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  11-23-2013
Number of Hours:  6.00
Manual Reference:  7-4, 7-5
Brief Description:  Right wing skins and leading edge

Match drilled all holes in the bottoms skins and then removed them from the skeleton. Made final adjustments to the leading edge ribs, then assembled the leading edge skin and ribs with clecos. Clecoed leading edge assembly to the main spar Fitted the inboard leading edge rib and tank joint plate into proper position and drillled joint plate and rib to skin. Clecoed and match drilled tank baffle attach angles to spar, then drilled and countersunk for and attatched platenuts to attach angles. Bolted attach angles to the spar and then clecoed tank baffle to the angles.
' style=

Leading edge clecoed to spar

Leading edge clecoed to spar

' style=

Joint plate and end rib

Joint plate and end rib

' style=

Tank attach angles bolted to spar

Tank attach angles bolted to spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.