KitLog pro

Powered By Kitlog Pro v2.0

Don Schwanke's Air Force One
' style=
Date:  8-24-2015
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Some more odds and ends completed

Finalized the pitot and AOA lines today. There was little ability to protect them from abrasion, so finally decided to slip a 5 foot length of fuel injection hose over them. Worked out well, and we got another troubling area finalized. Replaced the lines all the way to the adahrs unit and tywrapped them in place.
Mike is leaving in the morning, and although we thought we would be installing wing tanks, they did not arrive, so we worked on other areas that needed a couple of persons to complete. It has been a fun time with my son helping me, and the end result was LOTS was accomplished! Our main mission was to make the engine run, we accomplished that and so much more. It will be sad to not have him helping, it has been so enjoyable receiving all his help.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.