KitLog pro

Powered By Kitlog Pro v2.0

Don Schwanke's Air Force One
' style=
Date:  6-30-2011
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Fiberglass Work Done (almost)

Got the canopy apron done. The plans want you to make this a one shot layup, putting on layer after layer (There are 20 pirces of cloth to assemble while mixing epoxy.) I used black dye so that the inside would look better.
I did not get along well with the peel ply stuff, got to get some more experience with that stuff, I had never used it or seen it before. Got the canopy off with some damage to the panel cover, easy fix. Got filler curing on the bad spots now as shown in the last photo.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.