Date:  2-17-2011
Number of Hours:  0.02
Manual Reference:  
Brief Description:  Hinge Arrived, more work done

The hinge arrived from Vans, they sent me more than I needed, figuring that I would screw up at least one more before I was done. Almost did too, even with my red marks on the drill guide I think they need to make two drill guides, one for each drilling..
About ready to store the tailcone and start on wings, as soon as I finish the stabilator that I put on hold due to the hinge situation. Still not sure what I am reading in the plans for that part of the stabilator,but hope to figure it out when I get the parts all laid out.
Going to take a break, going to the Chapter Leaders Academy at EAA HQ for the weekend. Might get to look over the Sonex factory while there too.
' style=

Tried to Make This Foolproof

Tried to Make This Foolproof

' style=

Success at last

Success at last

' style=

Tailcone about finished

Tailcone about finished

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.