KitLog pro

Powered By Kitlog Pro v2.0

Don Schwanke's Air Force One
' style=
Date:  2-9-2011
Number of Hours:  0.05
Manual Reference:  
Brief Description:  It is all in a days work.

Did not get much airplane building done today, spent the day mostly trying to figure out one page of the plans! Some holes that SHOULD have been the right size simply weren't!
Still trying to get familar with Vans instructions. In a word, they are inconsistent, and leaves a lot to be figured out. That is not a big problem actually, as long as you KNOW you are supposed to go on your own. After all, this is an assembly job, not an engineering job.
Oh well, I did not screw anything up, some pricey pieces in that stab part.
Yep, you are looking at the only part I worked on all day, should have been about 20 minutes work.
' style=

Not much to show for a days work

Not much to show for a days work

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.