KitLog pro

Powered By Kitlog Pro v2.0

Don Schwanke's Air Force One
' style=
Date:  2-18-2017
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Blast tubes

Getting the blast tubes installed, to try to keep some cool air on the fuel system, especially the low pressure portion. Doing little stuff getting ready to do some transition training next week up in the Fort Worth area of Texas if the weather cooperates.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.