|
|
|
|
Don Schwanke's Air Force One
|
Date: 8-25-2015
|
Number of Hours: 0.00
|
Manual Reference:
|
Brief Description: The way it is
|
|
The way it works is like this. I get stumped at a stage of construction because I need some help. I then put that task off until I get help. The problem in all that is that one little task was holding up hours and hours of work following that task. The first photo is a good example, I could not by myself mount the terminal strips on the glove box. Mike helped me and now they are mounted, but I now need to run wires from the many sensors on the engine, and from the terminal strip to the Skyview. That will take me a while since most sensors have three wires, a ground, a 5 volt source, and the wire that actually tells what is going on, oil pressure, temps, manifold pressure, etc.. The other two photos are of the pitot and AOA lines from the ADAHRS unit. They are complete until I can get the wing up close to make connections with the lines in the wing. I think that fuel injection hose will protect them, it is some really tough stuff.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |