KitLog pro

Powered By Kitlog Pro v2.0

Don Schwanke's Air Force One
' style=
Date:  12-12-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Getting Ready

My waiting period is not idle time, I needed to do a lot of shop organizing before I could even think of unloading some crates. We decided to tile the floor as well, since we had been wanting to do something to the floors anyway. Finally got a space set up for initial assembly and tool sorting. A pegboard will be installed in back of the table to hold tools and misc. At least I got to lay out my RV12 tools to see just what I have.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.