KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  8-13-2017
Number of Hours:  4.00
Manual Reference:  10-9
Brief Description:  Nosewheel Breakout Force and Fairing prep

- Set the torque at 22-lbs per the manual directions.
- Drilled through the gear leg, per the instructions. Had to step it up from #46 to #30 and broke several bits in the steel in the process. Took a couple hours to get it done.
- Temporarily installed the nose gear in the firewall mount and set it up to start the wheel pant fitting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.