- Fit and drilled the F731C&D attach angles to the panel and F21A deck. Attached nutplates. - Temporarily fit instrument panel to fuselage and drilled attach angles to fuselage. - Fit and drilled the F793 L&R vent brackets to the fuselage using the SV-2 adaptors to help align the brackets. - Fit, drilled and trimmed the SV-2 & SV-5 vent assemblies to the instrument panel and attach brackets. - Began dissassembly of fwd fuselage, performing prep work (e.g. deburring, dimpling, etc) as I went. Got as far as removing the F771 skin and instrument panel subassembly. This concludes the "Fuselage" building instructions. I still have a good bit of clean-up to do as far as prepping and priming parts and then shooting the paint for the interior.