KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  9-29-2007
Number of Hours:  10.50
Manual Reference:  8-20
Brief Description:  F768 Subpanel assembly

- Drilled the F697 channel to the F768A center subpanel. Also, measured and cut the various holes in the F697 that are needed for the tip-up canopy latching mechanism. - Drilled the F644L&R channels to the flanges of the center subpanel. - Drilled the F746 engine cable control bracket to the center subpanel. - Riveted the forward fuselage channel, center sub panel, and F697 together. Riveted the F644 stub ribs to the F68A using the AN426 rivets as called for. - Installed the platenuts on the aft flange of the F745L&R Forward Fuselage ribs - Fit and rivet the F768D seal support angles to the F768L&R outboard subpanels.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.