KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  8-23-2007
Number of Hours:  9.00
Manual Reference:  8-19
Brief Description:  Cabin Frame Construction Completed

- Filed the ends of the cabin frame assembly and polished to even them out as the straps had been a little bit longer than needed. - Disassembled cabin frame and went through the various countersinking, deburring, etc, prep. - Primed the interior of the channels, both sides of the straps and the joint plates. - Reassembled the frame and riveted together using the squeezer and blind riveter.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.