|
|
Martin's Web Site
|
Date: 7-16-2007
|
Number of Hours: 1.00
|
Manual Reference: 8-14,15
|
Brief Description: Wing Mate Prep Work
|
|
Spent many hours over the past week reviewing the instructions, drawings, and other builders blogs for the wing mating and follow-on procedures. Built a detailed checklist of all activities, divided into preparation, mating and subsequent procedures, and after wing removal procedures. Also, cleaned out garage and measured dimensions for clearance. I will be able to put the wing-fuselage assembly entirely in the garage. The target date for performing the wing mate is this Saturday, the 21st. Tonight, I cut the 3" wide wood gauge block for measuring the wing incidence angle. Also, I put together the F664 Control column pushrod and cut the aluminum tube for the flap pushrods.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |