KitLog pro

Powered By Kitlog Pro v2.0

Martin's Web Site
' style=
Date:  6-23-2007
Number of Hours:  7.00
Manual Reference:  8-12
Brief Description:  Floors and Control Rod Tunnel

- Pop riveted the aft seat floors into place. - Fabricated the F741A-L&R and F741B control rod tunnel pieces. Match-drilled and riveted together. - Countersunk and riveted the nutplates on the control rod tunnel. - Removed the forward skins & drilled the screw holes to 5/32". Attached the nutplates for the control stick covers. -Reinstalled the forward seat skins.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.