Brief Description: Baggage floor complete; started bulkhead
Installed all nutplates for the baggage area floor. Match-drilled the F-751 lower baggage bulkhead to the F706 bulkhead. Reviewed DWG29 for bulkhead assembly instructions and located F6114 parts.