KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  3-6-2006
Number of Hours:  2.40
Manual Reference:  Sec 28-5
Brief Description:  Sec 28-5 steps 1-4

Continue preparing parts for the Fwd fuse and bulkheads. Match driled the AN3 bolts holes on the control colimn assembly. Match drilled the remaining AN3 bolt holes on the F1048. Clecoed the fwd fuse floor ribs to the fwd fuse bottom skin. Match drill all #40 holes
' style=

Match drill the control column mounts to each side

Match drill the control column mounts to each side

' style=

Add more parts for match drilling

Add more parts for match drilling

' style=

Match drill everything in this section

Match drill everything in this section

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.