Straightened flanges on all Right wing ribs, Clecoed to spar, match drilled, enlarged hole w/ step drill to 3/4" for electrical conduit in all ribs, Drilled #12 Holes in All but last 3 ribs, dissassembled, and deburred all holes in spars and ribs, deburred the flap hinge assemblies and the inboard flap hinge and torque tube bracket assembly. next step Scotchbrite and prime.