KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  11-2-2005
Number of Hours:  8.25
Manual Reference:  Sec 18-5
Brief Description:  Sec 18-5 steps 4-5

Riveted w/ Pro Seal. all stiffeners, for BOTH tanks, and installed drain plug in Both tanks and Fuel cap Flange in Right tank. This Pro-Seal stuff is without a doubt the pits. After a while you just get used to the mess and the constant clean-up
' style=

everything scotchbrited and masked

everything scotchbrited and masked

' style=

Left Tank Done

Left Tank Done

' style=

RIGHT tank Fuel Flange

RIGHT tank Fuel Flange

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.