KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  10-24-2005
Number of Hours:  6.25
Manual Reference:  Sec 18-2,3,4
Brief Description:  Sec 18-2steps 5-6 18-3 steps 1-4,18-4s 1-7

Pre assemble, cleco, match drill, etc. the RIGHT tank. Get it to the same place as the Left
' style=

Install tank stiffeners in RIGHT tank

Install tank stiffeners in RIGHT tank

' style=

RIGHT ribs clecoed and drilled

RIGHT ribs clecoed and drilled

' style=

RIGHT tank preassembled, matchdrilled

RIGHT tank preassembled, matchdrilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.