KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  1-16-2006
Number of Hours:  2.30
Manual Reference:  Sec 23-2
Brief Description:  Sec 23-2 steps 1-4

Fabricate Aileron Torque tube pushrod. Cut aluminum tubes to length, deburr, copy patter from plan pages 23-8, and transfer to both ends of both tubes, start punch holes on each end of each tube. Pilot drill 6 holes #40 in each tube end, insert Rob end holder, and final drill #30 6 holes in each end, deburr holes, reattach, and rivet using MSP-42 pop rivets. Scotchbrite and Prime both tubes.2
' style=

final Drill #30 on each end

final Drill #30 on each end

' style=

Riveted w/ MSP 42 pop rivets

Riveted w/ MSP 42 pop rivets

' style=

Ready for priming

Ready for priming

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.