Date:  3-6-2009
Number of Hours:  2.50
Manual Reference:  Sec Final-44
Brief Description:  Sec Final-44

Well today marked another pretty big milestone for me. Gary Towner (DAR) drove down from Overgaard today, and performed an inspection of N519PJ. Gary had all of the parperwork ready, except for the affidavit, that I had to have notarized, and we began by completing the required forms. Made appropriate entry in my (new) Airframe log book, and then we moved to the inspection. Gary's primary focus and concern was the flight controls. we began inside of the cockpit, and then proceeded outside to all of the flight surfaces and connections. His next stop was the firewall forward area. I pointed out to him one item I noticed yesterday, where I hadn't sealed (RTV) a firewall passthrough. Gary spent about 1 1/2 hours on the inspection, and didn't note any squawks. We moved back to finalize the A/W certificate, and went through the Ops Limitations. Gary gave me a REALLY big Phase 1 test area. Essentially DVT to Kingman, to Laughlin (Colorado River) down the river to Parker then SouthEast all the way to Casa Grande, then back west of PHX (Goodyear, Glendale) and back to DVT. Gary helped walk me thrugh the repairmans cert application, and then handed me the A/W cert and the Ops Lim and made the official entry in the Airframe logbook.
' style=

Gary Towner DAR (and RV4 builder/owner/flyer)

Gary Towner DAR (and RV4 builder/owner/flyer)

' style=

Some Guy with a wannabe RV grin

Some Guy with a wannabe RV grin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.