KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  2-4-2009
Number of Hours:  1.50
Manual Reference:  Sec Final-35
Brief Description:  Sec Final-35

I only had a couple of hours @ the airport today becaus ei've got a bunch of cub scouts coming over this afternoon for a session on tools and to build a simple set of shelves for each of them. So today I torqued all of the wing attach bolts to the proper torque values, Then attached the cannon plugs and antenna and pitot/static connections. I also installed the An 6 bolts and castle not/cotterkey's on the aft spars. I connected the fuel lines from each wing. The remaining connections ar to connect the control sticks to the torque tubes. There are also 2 AN4-14 bolts that need to be installed on the left wing root.
' style=

Right wing bolts torqued And connections made

Right wing bolts torqued And connections made

' style=

Ditto Left wing

Ditto Left wing

' style=

Aft spar attach bolt

Aft spar attach bolt

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.