This is actually work over the past 3 days. And it amounts to finishing up some items in Sec 44 for the left wing attachment. Including riveting the fuel tank support brace to the support (AN4704's) and then attaching countersunk #8 nutplates to the forward section inf the Left wing skins to attach the root fairings. As most things go this took a bit more time than I expected, partly because the wing is sitting in the cradle and I don't have any body to help, so I had to work in the limited space. Then after priming all of the parts. I attached the inboard fairing support flanges to the fuse. I didn't read the plans carefully enough and had to remove some of the nutplates in order to get either the pop rivet or rivet gun in place. These braces used 470 4's, CS 4's, and LP4's, quite a combo of rivets. The only things remaining on the left wing are to route the electrical wired from the cockpit througha gromet/snap bushing for the wing. And to fabricate a Fuel vent tube and the fuel line from the left wing tank to the fuel valve. As soon as I can get some help I'll mount the right wing and then try and get the wings finished up and on to the paint shop.
Countersunk nutplates mounted to Left fuel tank for root fairing attachment
Inboard fairing support brace w/ countersunk nutplates