KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  10-10-2005
Number of Hours:  4.20
Manual Reference:  Sec 13
Brief Description:  Sec 13-4 & 5 steps All

Install Fuel tank and wing attach nutplates to Spar web @ wing root. Fabricate Wing ties down brackete and attaqch to respective spars.Since I've got limited space in my shop, I'm going to to skip ahead and complete the outboard LE, Fuel tanks, Ailerons, and Flaps befor attaching the ribs and the skins, That way, I can store the spars until time to integrate everything, and then move the wings to storage whiel working on the Fuse.
' style=

Tiedown bracket drilled and ready to prime

Tiedown bracket drilled and ready to prime

' style=

Torque AN5a bolts to attach tiedown bracket and Aileron belcrank brackets

Torque AN5a bolts to attach tiedown bracket and Aileron belcrank brackets

' style=

Finisher w/ Maion Spar

Finisher w/ Maion Spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.