KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  8-22-2005
Number of Hours:  1.70
Manual Reference:  Sec 10-22
Brief Description:  Sec 10-22 steps 1-3

Rivet attachment bar support angle and the stop doubler to the aft deck then install AN 3 bolts. Torque to 20-25 inch pouinds (didn't seem like very much checked with the RV10 matronics list and they confirmed it's
Ok. learned to torque from the Nut side if at all possible.

No Pics
' style=

No Pics

No Pics

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.