KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  2-2-2007
Number of Hours:  5.00
Manual Reference:  Sec 45-finishing7
Brief Description:  Sec 45 Finishing step 7

The Doors are ready for Smooth Prime. Spent the best part of today, sanding and filling the Right door frame where the upholstery panel won't cover. I also filled in the delrin blocks that capture the pins for the door closing linkage, Filled and sanded the hinge for the cabin door struts for a more appealing appearance. I'm going to put these away and work on the cowl beginning tomorrow. I need to order some more Smooth Prime anyway. The DHL truck arrived today and brought the Cowl mounting fixture from Aero Composites today, so I should be good to go Tomorrow. Took advantage of the break in fiberglass/filler dust to hose out the garage.
' style=

The door pin latch bocks filled and sanded

The door pin latch bocks filled and sanded

' style=

Door lift strut hinge faired

Door lift strut hinge faired

' style=

Doors and panels in storage in Casita

Doors and panels in storage in Casita

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.