KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  1-25-2007
Number of Hours:  7.00
Manual Reference:  Sec 48-finishing9
Brief Description:  Sec 48 Finishing step 9

Began by sanding the Nose wheel fairing that I had applied SuperFil last night, It's got a lot better countour now. then finished sanding all of the rest of the parts w/ 220 grit. most of the pinholes look like they are gone at this stage. then applies what I hope is the last coat of Smooth Prime to all but the Nose wheel fairing. Even though I thought I had al of the pinholes, as I was psinting, i notices a few more. At this point I'll wait until after sanding tomorrow w/ 320 and then maunall fill them w/ smooth prime and final sand them, I think I should be able to get all of the wheel/leg fairings ready for paint by EOD tomorrow.
' style=

All sanded w/ 220 grit

All sanded w/ 220 grit

' style=

Tomorrow final sand w/ 320 and fill remaining pinholes

Tomorrow final sand w/ 320 and fill remaining pinholes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.