KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  11-25-2006
Number of Hours:  2.50
Manual Reference:  Sec 45-doorgap3
Brief Description:  Sec 45 Door gap fix Right and Left doors

More of the same, did the initial sanding of the Left door, then removed the door, this door sits lower than the cabin top in a couple of places so it's going to require several tape/fill/sand cycles to get them booth at the same level and smooth. After the initial sand I mixed up the goop and applied to the cabin areas that needed some build-up. have a couple pf places on the right door (not shown) where I also did smoe minor build-up's after they are cured that should do it for the Right door frame portion, If this sits up hard enough tonight I might be able to get another sanding done on it and then get another build-up applied so it can cure/harden on Sunday. We'll see.
' style=

Applied 2nd coat to build-up some low areas

Applied 2nd coat to build-up some low areas

' style=

Building up some low areas on the cabin top

Building up some low areas on the cabin top

' style=

Left door forward door post

Left door forward door post

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.