KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  6-3-2006
Number of Hours:  8.00
Manual Reference:  Sec 39-5 thru 39-8
Brief Description:  Sec 39-5&6&7&8

Made a major dent in the control system install. Nothing remarkable, the thing which took the most time was positioning the washers on either side of the rod ends inbetween the weldments. Takes some fannagling and some patience. I redid the initial installation of the Left control stick base, the weldment is too narrow for the brass bushing, and initially I tried to spread the flanges on the weldment, however when torqued, they bind a bit and cause friction in the controls. Th eplans tell you that it may be necessary to adjust the length of the bushing and the pivot tube. I did the Right by shortening the brass bushing to the correct length and then shortening the pivot tube, and the whole thing went in much smoother. I did put some washers in to take up the slack, The result is a friction free installation with no slop/play.
' style=

The 'light' washers installed took a bunch of time and the O'l man had to wiggle into the tailcone

The 'light' washers installed took a bunch of time and the O'l man had to wiggle into the tailcone

' style=

Redid the control stick base install to eliminate friction

Redid the control stick base install to eliminate friction

' style=

All hooked up (except the elevator) to !@#$ hot to continue today (110!)

All hooked up (except the elevator) to !@#$ hot to continue today (110!)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.