KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  5-11-2006
Number of Hours:  6.00
Manual Reference:  Sec 33-8;9;&10
Brief Description:  Sec 33-8&33-9&33-10

Finished off the baggage section. Primed and riveted the Right baggage cover. Match drilled the Upper and Lower baggage bulkhead corregations. Drilled same for nutplates. riveted nutplates, Installed wear blocks on the baggage bulkhead corregations primed them and installed on fuse.
' style=

Right baggage panel/cover going in.

Right baggage panel/cover going in.

' style=

K1000-8 Nutplates clecoed and drilled

K1000-8 Nutplates clecoed and drilled

' style=

Baggage bulkhead corregations installed.

Baggage bulkhead corregations installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.