KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  5-3-2006
Number of Hours:  3.00
Manual Reference:  Sec 33-2 & 33-3
Brief Description:  Sec 33-2 and 33-3 All steps

Started a new section today the baggage area. HOWEVER, I found quickly that I was missing some parts, The F1024 L&R Seat floors are AWOL, I searched the shop, storage and throughout the house, and they just aren't here, I must have misse3d them in the inventory. So,,,,, a call to Van's.. and wait. Fortunately theres still quite a bit that I can do while waiting. I'm waiting on some more soundproofing material to arrive anyway, so it's probably not a hangup. Also I need to do some planning around Antennas, mounting location, Wiring conduit, and inspection plates/access. At this point there's a ton of stuff that you can work on in parallell. Started on 33-5 cutting the baggage floor stiffeners.
' style=

Cut, drilled, and clecoed the hinges for the seat back supports to the baggage floor

Cut, drilled, and clecoed the hinges for the seat back supports to the baggage floor

' style=

Both baggage area floors clecoed and drilled

Both baggage area floors clecoed and drilled

' style=

Baggare area door frame clecoed, & drilled

Baggare area door frame clecoed, & drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.