KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  3-8-2006
Number of Hours:  3.30
Manual Reference:  Sec 28-11
Brief Description:  Sec 28-11 steps 1-6

Begin to rivet the parts in the assembly. Start with attaching nutplates to some of the bulkheads. Then add the Seat Rail supports on each side, Attach support angle to Firewall ribs. Then rivet the floor ribs and fuel brackets to the fwd bottom skin.
' style=

Attach nutplates and seat rail supports to blkhds

Attach nutplates and seat rail supports to blkhds

' style=

Both Left and Right sides

Both Left and Right sides

' style=

Floor ribs being riveted

Floor ribs being riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.