KitLog pro

Powered By Kitlog Pro v2.0

Deems RV10 Project
' style=
Date:  2-14-2006
Number of Hours:  2.50
Manual Reference:  Sec 26-4
Brief Description:  Sec 26-4 steps 1-6

Assembled the seat ribs onto the Aft Center bulkhead qassembly. This is the beginning if what will ultimately be the Fuselage.
' style=

Match drill the inboard seat ribs

Match drill the inboard seat ribs

' style=

Flap actuator arrach bracket riveted in place

Flap actuator arrach bracket riveted in place

' style=

Inboard and outboard seat ribs attached to the AFT center section

Inboard and outboard seat ribs attached to the AFT center section

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.