Powered By Kitlog Pro v2.0
MRB's - RV-14 Build log
RV-14A
4-Wings
12-20-2014
< Previous Log Entry
Next Log Entry >
Date:
12-20-2014
Number of Hours:
4.50
Manual Reference:
Sec 15
Brief Description:
Aft wing spar preparation
Both wing rear spars are match drilled with the aileron brackets, the doublers and the wing ribs. Then all the holes are deburred and the parts are cleaned and primed.
Deburring holes, smoothing the edges and scuffing.
Parts thoroughly cleaned and ready for priming
Primed parts ready for assembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
87
213
4-Wings
71
208
7-Instruments
1
9-Painting
1
DISCLAMER
1
MATERIAL MANAGEMENT
2
3
MISC
2
R&D
5
2
Tips & Tricks
1
TOOLS
3
Copyright © 2001-2024 Matronics. All Rights Reserved.