Powered By Kitlog Pro v2.0
MRB's - RV-14 Build log
RV-14A
All
1-1-2016
< Previous Log Entry
Next Log Entry >
Date:
1-1-2016
Number of Hours:
1.00
Manual Reference:
Sec 18
Brief Description:
Fuel Tank - Final Assembly
Placing the top stiffener and the tank attach bracket is a pretty straight forward job.
Top tank stiffener cleaned out and ready to be clecoed
The stiffener has to be "slipped" into those notches amid the tank ribs
The tank attach bracket clecoed in place with sealant
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
87
213
4-Wings
71
208
7-Instruments
1
9-Painting
1
DISCLAMER
1
MATERIAL MANAGEMENT
2
3
MISC
2
R&D
5
2
Tips & Tricks
1
TOOLS
3
Copyright © 2001-2024 Matronics. All Rights Reserved.