KitLog pro

Powered By Kitlog Pro v2.0

MRB's - RV-14 Build log
' style=
Date:  1-1-2016
Number of Hours:  1.00
Manual Reference:  Sec 18
Brief Description:  Fuel Tank - Final Assembly

Placing the top stiffener and the tank attach bracket is a pretty straight forward job.
' style=

Top tank stiffener cleaned out and ready to be clecoed

Top tank stiffener cleaned out and ready to be clecoed

' style=

The stiffener has to be

The stiffener has to be "slipped" into those notches amid the tank ribs

' style=

The tank attach bracket clecoed in place with sealant

The tank attach bracket clecoed in place with sealant

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.