KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  1-22-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Covering Wing

Continued lay out of rib lacing holes on top of right wing; punctured holes for lacing. Using soldering iron, opened and heat sealed holes. Layed out tape lines of 4 inches in prop blast area and 3 inches otherwise. Applied two coats of adhesive in area to be taped.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.