KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  8-6-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Nose bowl inlet

Re installed lower have of nose bowl and located position for the inlet to be made in the lower half. Began making a tube to be fiberglassed in the lower half for a flexible hose to be attached between it and the injector. Using some heavy fiberglass stock I rolled and glued with 3m to make the tube that I will fiberglass into the lower half. Held in position with numerous clecos.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.