KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  4-23-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Engine Cowling

Layed out left hand cowling door with construction paper, then .032 aluminum, but quickly found that that thickness is too stiff. So, using some .025 aluminum, I layed out, cut, and attached the left cowl door. Layed out and drilled holes for attachment to hinge line.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.