KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  2-26-2011
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Engine

Using some .040 mild sheet steel, I fabricated a bottom for the battery box. I also fabricated hold down guide tubes and welded those to the side of the box using som 3/8 tubing. I also began laying out backer plate for attachment points and clamp attach points; Prepared for and installed nut plate on backer plate for the battery box
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.