KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  2-21-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Engine

Started assembly of sump and induction box. The 5/16 -24 bolts that attach the two were installed, torqued to 100 in lbs and safety wired. I then installed the engine mount ears using new hardware and torqued to 220 in lbs on grade 8 nuts.
I received the synthetic grommets and installed them after opening the holes in the firewall.
' style=

Induction Box safety wired

Induction Box safety wired

' style=

Skydynamics Sump and Induction assembled

Skydynamics Sump and Induction assembled

' style=

Firewall through block

Firewall through block

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.