Started assembly of sump and induction box. The 5/16 -24 bolts that attach the two were installed, torqued to 100 in lbs and safety wired. I then installed the engine mount ears using new hardware and torqued to 220 in lbs on grade 8 nuts. I received the synthetic grommets and installed them after opening the holes in the firewall.