KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  4-20-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Wing Preparation

EAA advisor inspection prior to closing up center section fuel tank; prepared to install lower skin; using silicone I applied numerous dollups on tank; then applied T88 adhesive to all contact points for skin; clamped in place and installed brads about every one inch or so around perimeter. Varnished LE and new skin over center section fuel tank.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.