KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  4-18-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wing Preparation

zInstalled center section fuel tank in the upper wing. I applied 10 or 12 dollups of clear pure silicone and while still wet, set the tank in and pushed down to make sure all areas of tank surface made contact; installed foam and affixed in place with silicone adhesive. Installed 5 nut plates in LE to attache the LE of the canoe.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.