KitLog pro

Powered By Kitlog Pro v2.0

Dugans' Skybolt Web Site
' style=
Date:  10-23-2011
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Engine

Finished fitting and trimming inter cylinder baffles; Set up holes for ignition wires and fuel line. Prepared and alodyned each of the baffles. installed the baffles and applied RTV on leak areas. Installed induction system and torqued to specs.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.