KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  11-22-2017
Number of Hours:  4.00
Manual Reference:  FF2 - 12 & 13
Brief Description:  Baffles Install & Cowl Trim

Continued fabrication and installation of engine baffles. Did not install Prop Govenor Cable Bracket as it will need to be moved due to the A/C compressor, but did remove the side openings. Installed both inlet ramps to the engine.

Reached step step 4 on FF2-13 and realized that it was now time to begin preparation of the cowl. Did the initial trim of the cowl fronts per pg. 47-4. At the last step on this page, I determined that I needed to trim a bit more in order for the 2 halves to fit together properly.

Stopped early for Thanksgiving holiday tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.