KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  2-27-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wiring Installation - Power Wire To Tailcone

Confirmed the wire sizes and lengths for the power wires that will run down the left side of the aircraft. (Did a table of wires required at home last weekend.)

Determined approximate wire lengths required for the wires that will run from the tail cone to the panel/firewall area. Cut the required wires for this run to length. Bundeled them together at one end using masking tape.

Pushed the bundle of wires through the conduit running from the tail cone forward along the left side. Managed to get all of them into a single conduit.

Installed nut plates into the doubler plate for the Garmin GA 35 antenna after receiving confirmation from G3Xpert via email that this is an acceptable method for mounting the antenna.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.